Page 3 of 7
Second Day (November 07, 2009)Capacity Management
1. Definition of capacity
2. Capacity planning
3. Capacity requirements planning
4. Capacity available
5. Capacity required
6. Schdulling orders
7. Making the plan
JIT and TQM:
1. Just in time philosophy
2. Waste
3. JIT environment
4. Manufacturing planning and control in a JIT environment
5. Lean production
6. TQM
7. Quality cost concepts
8. Variation as a way of life
9. Process capability
10. Process control
11. Benchmarking
Production activity control
1. Data requirement
2. Order preparation
3. Scheduling
4. Load leveling
5. Schedule bottlenecks
6. Theory of constraints and drum buffer rope
7. Implementation
8. Control
9. Production reporting.







